Filming

Filming
Filming at an event

Wednesday, 11 November 2015

Production- Ripple

I have finished filming for my production, Ripple.

I filmed over 2 days with one day being interior shots and the other for exterior.

I directed and camera op, Joshua was 1st AD and camera assist. Jack was Sound op and Josh B helped with transport. Sam was now 'Neal' replacing Matt, Cheyenne was 'Linda'.

The shoot went really well and everyone was working hard and professional. I enjoyed filming and using the equipment like the track.  Here is a couple of photos of us on set.

Day 1 

Day 2

I will edit the footage ready for the 1st edit.

No comments:

Post a Comment